Gasoline generator and welding machine
search
|
Gasoline generator and welding machine
Details Gasoline generator and welding machine AC power can slowly increase and decrease the current through amplitude modulation to achieve the purpose of preheating and slow cooling, which is very beneficial for aluminum alloy welding. Alternating current can also be used for multi-pulse spot welding, where cooling time is left between two or more pulses to control the heating rate. This method is mainly used for welding thick steel plates. DC power is mainly used in situations that require large currents. Since most DC welding machines are powered by three-phase power supplies, unbalanced three-phase loads can be avoided when using single-phase power supplies. Increase the preload to eliminate gaps between thick workpieces and make them fit tightly. Using preheating pulses to improve the plasticity of the metal makes it easy for the workpiece to fit closely and prevent spatter. This can make multiple bumps evenly contact the flat plate before power welding to ensure consistent heating of each point. Plastic temperature range of materials Metals with a narrow plastic temperature range (such as aluminum alloys) are very sensitive to fluctuations in welding process parameters and require the use of welding machines that can accurately control process parameters and require good electrode followability. Poor weldability. << :r =>Product model :r => :r =>Electrode (welding rod diameter) :r =>Normal welding. Spot welding :r =>Current adjustment range :r =>~ :r =>Auxiliary power supply rated power :r => :r =>Auxiliary power supply backup power< br/> :r => :r =>DC output :r =>/ :r =>Engine model :r => :r =>Starting method :r =>Hand start :r =>Cooling method :r =>Air cooling :r =>Welding rated voltage : r => :r =>Auxiliary power supply voltage :r => :r =>Valve form :r => :r =>Exhaust Quantity :r => :r =>Ignition system :r =>Contactless transistor ignition :r =>Fuel tank capacity :r => :r =>Unit size :r =>** :r =>Fuel :r =>Gasoline :r =>No-load voltage< br/> :r => :r =>Weight :r => :r =>Load endurance rate :% :r =>After-sales service Service :r => Suzuka Original Nationwide Warranty :r => Quality Assurance :r => One-year warranty and lifetime maintenance Suzuka Power/After-sales Service /> .If there is a product quality problem that cannot be repaired within seven days after shipment, we can unconditionally replace it with a new product except for quality problems caused by improper use by the customer. .If quality problems occur within three months of sales, except for quality problems caused by improper use by the customer, if the customer can repair it by himself, the manufacturer will send the necessary accessories for replacement free of charge. If the customer cannot repair it by himself, he can send it back to the manufacturer for repair. Gasoline generator and welder dual-purpose machine A total of0articles Related Comments: |